Jump to content

Kel-Durin: Difference between revisions

From Adaris
No edit summary
No edit summary
Line 16: Line 16:
* Inspection Lane – A marked route through the central chamber for caravan checks and documentation.
* Inspection Lane – A marked route through the central chamber for caravan checks and documentation.
* Tool Hall – A secured storage area for road tools, engineering kits, and stone-testing instruments.
* Tool Hall – A secured storage area for road tools, engineering kits, and stone-testing instruments.
* Rest Vault – A dry, level area with stone platforms for brief rest and meal breaks.
* Rest Vault – A dry, level area with stone platforms for rest and meal breaks.
|Defenses and Watch=The outpost is staffed at all times by a rotating team of Stonewardens and road engineers. Defensive design includes reinforced doorways, single-path routing for movement control, and a manual seal mechanism on the entry and exit gates.
|Defenses and Watch=The outpost is staffed at all times by a rotating team of Stonewardens and road engineers. Defensive design includes reinforced doorways, single-path routing for movement control, and a manual seal mechanism on the entry and exit gates.
|Threats and Dangers=Environmental shifts remain the primary concern: rock pressure changes, dry gas leaks, and minor seismic adjustments are closely monitored. Early signs of air quality fluctuation trigger gate delay and additional inspection. Unauthorized passage is recorded and reported to the nearest deep station.
|Threats and Dangers=Environmental shifts remain the primary concern: rock pressure changes, dry gas leaks, and minor seismic adjustments are closely monitored. Early signs of air quality fluctuation trigger gate delay and additional inspection. Unauthorized passage is recorded and reported to the nearest deep station.
}}
}}
[[category:Khargaath Range]]
[[category:Khargaath Range]]

Revision as of 22:48, 30 March 2025